Monday, December 23, 2013

House Update...

The progress on our house slowed down a bit, because of the snow we had here in Maryland over the past month (2 snowfalls).  The roofers finished the roof on Friday, so know we are officially 'under roof', which means our contractors can now work on the interior of the house without worry about damage from any precipitation.

Below is a front elevation drawing.  We have since gotten rid of the half circle window on the large window above the front door, because I didn't want heat pouring into our sitting room in the summer.  We are adding a cupola (pictured here in the windows with copper roof pic) and a weather vane (here) on the top of the roof.
The two sets of French doors and balcony on the top left will be our Master Bedroom, and overlook our neighbor's horse farm and our woods.  The center top window is our Master Sitting Room.  The top right window will be the Superhero's Playroom.  The two sets of French Doors with balcony on the bottom left will be our Family Room.  The window on the bottom right will be a Study/5th bedroom,/superhero's downstairs playroom.    The window all the way on the right is on our garage.



Progress!!  If you look close, you can see the roofers putting on our shingles.



Side view


Master Bedroom


Master Sitting where Eric and Colton are standing


Master Closets and Master Bathroom

Superheros Upstairs Playroom



Colton's Room

Blake's Room


In the next week, we should have our basement framed and our windows in.  We are so looking forward to seeing the progress when we get home!

No comments:

Post a Comment