The columns and railing in our Master balcony got installed this week.
Our electrical wiring and lighting is about half installed now, and should be finished mid-week.
|
Wiring on Blake's wall. On the other side is out hallway, and behind that is our Master. |
|
Electric wiring in our Master, which will be on the left side of our bed. |
|
LED housing, plumbing and HVAC in Colton's ceiling |
We also got our double garage door installed, which will be a large space when opened to get our ride-one mower or ATVs (hopefully!) outside.