Last week, our hard wood floors were installed. We still need them sanded and finished, but for now they are covered up with brown paper, awaiting for all of the trim to get installed and painted. Our screened porch was built, but as of now we still need it stained, screened, and the shingles and door put on. Our air conditioning units are also installed, as well as our kitchen and master bathroom cabinets. The installers will be making a template of the granite, but for now, most of the cabinets and hardware are installed.
Take a look!!
This wall will house the fridge, sink, and the island is in front. |
This wall will house a desk and the range and range hood |
We had wall cabinets installed top and bottom, to save 6" of floor space. |
I
n the next 3 weeks, we should have all of our trim up, the house painted a second coat of paint, stone facade, and hopefully our tile work installed.